The Following Buildings Are Required to Obtain Clearance From Respective States:
- Buildings that are used as homes or high-rise structures with more than four floors, including a mezzanine floor, but are not hotels or guesthouses and have a height of more than 15 metres
- Hotels and guesthouses that are above 12 metres high with a ground floor and three more stories, including a mezzanine floor
- educational structures with a height of more than nine metres or two above storeys, including a mezzanine level
- Institutional structures with a height greater than 9 metres or with a ground story and two additional floors, including a mezzanine level
- all Assembly structures
- Business structures of a height greater than 15 metres or four additional floors, including a mezzanine floor
- Mercantile structures taller than nine metres or with a ground story and two more floors, including a mezzanine floor
- Industrial structures with a total covered area of more than 250 square metres
- Storage structures with more than 250 square metres of covered space on each floor
- All hazardous structures with covered areas measuring greater than 100 square metres on each floor
Documents Required to Apply for Fire NOC Compliance
- Two sets of building plans, obtained from the building authority, consisting of a site plan, a building plan, a layout plan, an analysis report, and a form of supervision
- The building designs must include all the details outlined in the bylaws.
- As completed through a questionnaire, a checklist
- Model of the Structure
- As Certified by the Architect Checklist
- Certification of Building Stability
- A single copy of the applicant's Aadhar card
- A view from the outside taken of the establishment or building
- Certificate of Quantity and Completion from a Reputable Authority (Electric Wiring)